News

 

News Frumecar

Frumecar participates in the works for the extension of Line 3 of the Madrid Metro.

by | Feb 10, 2023 | Concrete, Concrete, Concrete Plants, News, Sustainability

Frumecar will participate in the extension works for Metro line 3 to link the Villaverde Alto and El Casar stations, with an expected completion period of 22 months. The action consists of extending line 3 by 2.6 kilometers, which will allow it to connect with line 12 and, at the same time, with the C-3 of Cercanías Renfe trains, which connects Aranjuez with Atocha.

For this, the Frumecar BASIC WET 120 concrete plant has been installed, with a production capacity of 120 m3/h. Designed with modules, the BASIC WET 120 offers a comprehensive solution that combines robustness, reliability and high production performance with versatility and simplicity in the transport and assembly processes.

This measure will provide greater connectivity to the more than 1.1 million inhabitants of five municipalities in the south of the region (Getafe, Alcorcón, Móstoles, Fuenlabrada and Leganés) who use line 12 of the Madrid Metro on a daily basis.

At Frumecar, we continue with the firm intention of being leaders in manufacturing, transport and digital technology solutions for the concrete industry in projects in more than 70 countries that, like the Madrid Metro, have trusted us to provide concrete solutions to the concrete sector.

Not to miss any novelty

Privacy Policy

10 + 12 =

RELATED POST